Hero image

Augusta Hwy Joy Baluch Bridge

Projects

The Augusta Hwy Joy Baluch Bridge project in Port Augusta, Australia, centered on digital modelling and design reporting for a critical government highway crossing. The PW2PA alliance commissioned J&F for LOD 300 level modelling and barrier bolt/stub column design optimization.

Key features comprised:

  • Production of a detailed LOD-300 bridge model
  • Generation of clash reports for barrier and stub columns
  • Development of standard operating procedures for repetitive details

BIM 360 and Revit provided the collaborative platform for streamlined review cycles.

Location

Port Augusta

Australia

Client: PW2PA alliance (CPB, Aurecon, GHD)

Government of South Australia

Key Outcomes

  • Improved design accuracy and ease of site installation

Expertise Provided

Bridge Modelling
Reinforcement Detailing
Clash Management
Let's Build Together

Curiosity , Bravery & Trust

World-Class Engineering